Kenya115

Client:  – Ministy of Agriculture & National Irrigation Board
Location:  – Tana River County
Surface Area: – 70km
Year Completed:  – 2014
Value: – Kshs. 5.5 Billion
Architect:   –

 

Description.

Development of 15,000 acres of land in the Tana River Basin which involved access roads, gravity water intake, over 70km of irrigation canals, drainage canals, housing, infrastructure facilities, social services etc. Feasibility studies, Detailed Designs, Contract Documents and construction supervision.

Construction of Chemususu Dam Water Supply distribution Project. The project will serve about 300,000 people and livestock in Eldama Ravine and parts of Mbgotio and Rongai districts.

The proposed project components comprise:

  • Construction of Raw Water Gravity Main of length 0.7km and 500mm diameter
  • Construction of new Water Treatment Works of capacity 35,000 m3/day
  • Rehabilitation of the existing Water Treatment Works of capacity 6,000 m3/ day
  • Construction of Clear Water Gravity Main of length 16.4km and diameter 500mm
  • Construction of Water Distribution Networks, total length 235km with diameters ranging from 400mm to 50mm
  • Construction of 25No. Storage Reservoirs with capacities ranging from 5.000 m2 to 200 m3.
CHEMUSUSU-DAM-PIC

The Sh5.5 billion water project marks the accomplishments of one of the Millenium Development Goals of increasing water supply in the country and is the largest project undertaken in the Rift Valley region.

The 45 metres high dam with a capacity of of 12 million cubic metres of water is set to benefit over 600,000 people through various projects that include piped water supply, fishing, irrigation and energy production.

Residents of Eldama Ravine Town and parts of Koibatek will get empowered economically through the various activities after the completion of the project.

The project which was started by the National Water Conservation and Pipeline Corporation (NWCPC) has started creating some impact on the locals.

The government is already using the water for some projects including Parkerra irrigation scheme in Marigat District with some locals also benefitting from the spill-over water from the dam.

During the construction of the dam, communities living upstream had raised concerns that they may not benefit from the project.

This led to signing of a memorandum of understanding for the construction of four water supply projects which are estimated to cost Sh36 million.