Client:  –
Location:  –
Surface Area: –
Year Completed:  –
Value: –
Architect:   –

 

Description.

Reinforced concrete river bridge on the Thika-Garissa Road in the Mwingi Area. Site investigations, topographical survey, structural engineering design, contract documentation and construction supervision. MoR&PW

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.