Client:   Tana Water Services Board
Location:   Embu County, Lower Eastern (including Mwingi and Tharaka Nithi).
Surface Area: –
Year Completed:   Ongoing Project
Value: –
Architect:   –

In June 2013 Embu County officials hosted a successful collaboration meeting with a team of top corporate leaders from Korea over the construction of Kamumu dam. The team from Korea also visited the proposed Kamumu multi-purpose water dam site and toured the immediate catchment area during their June 14th trip.

The project upon completion is expected to provide water for domestic use and irrigation in the 3 counties of Embu, Tharaka Nithi and Mwingi. Feasibility studies indicate that the project will cost about Ksh. 11 billion.

Feasibility Study and Preliminary Design, Environmental Impact Assessment, valuation of resettlement

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.