Client

Northern Water Services Board.

Location

Samburu County

Period

March 2018-June 2019

Consultancy Services For Feasibility Study & Detailed Design For Maralal Water Supply System (Samburu County)

  • Reviewing all the design documents and calculations.
  • Supervision and coordination of construction works including preparation of operation and maintenance manuals and as built-drawings.
  • Provide personnel and all other necessary resources to supervise the construction of the works throughout the assignment.
  • Reviewing all the design documents and calculations.
  • Supervision and coordination of construction works including preparation of operation and maintenance manuals and as built-drawings.
  • Provide personnel and all other necessary resources to supervise the construction of the works throughout the assignment.